62-0391-03
INSTALLATION INSTRUCTIONS
Class 3400 Meter
ADVANCED KWH/DEMAND METER
WITH COMMUNICATIONS
E-Mon
1985 Douglas Drive North
Golden Valley, MN 55422
www.emon.com
[email protected]
Страница 1: ...62 0391 03 INSTALLATION INSTRUCTIONS Class 3400 Meter ADVANCED KWH DEMAND METER WITH COMMUNICATIONS E Mon 1985 Douglas Drive North Golden Valley MN 55422 www emon com info emon com...
Страница 2: ...ed with your products we provide toll free technical and sales support Monday through Friday 8 00 am to 7 30 pm EST 800 334 3666 You may also reach us via email at info emon com If you have questions...
Страница 3: ...16 Section 6 6 Line Voltage Current Sensor Diagnostics 16 Section 6 7 RS 485 Wiring 18 Section 6 8 RS 232 Communications 19 Section 6 9 Modem Wiring 22 Section 6 10 Modbus RTU Wiring 25 Section 6 11 B...
Страница 4: ...proper installation of this meter Verify the input voltage rating and configuration on the unit panel label to ensure that it is suitable for the intended electrical service 3400 meters labeled for 12...
Страница 5: ...or The protection and safety features provided by this equipment may become impaired or otherwise compromised NOTE If any trouble arises during installation or functional verification opera tions do n...
Страница 6: ...is connected to the correct terminals One three terminal screw connector RS485 is for RS 485 communications One two terminal screw connection output is for a pulse output One RJ 45 jack J8 is provide...
Страница 7: ...nd the board mounts on the inside of the housing door No additional connections to the display board are required The display board s LCD readout indicates the metered values as well as errors associa...
Страница 8: ...Type kit split core scs solid core non supplied blank Brand Class Voltage Amperage Enclosure Communication Protocol Current Sensor Option Current Sensor Option Current Sensor Option Example E 34 208...
Страница 9: ...Pollution Degree Degree 2 In Accordance With IEC 664 Installation Overvoltage Category Category III Measurement Category Category III Enclosure Material UL Type 1 JIC Steel or Type 4X Plastic Rain Tig...
Страница 10: ...ed CAT 5e cable 8 conductor stranded 24 AWG Cable Connector RJ 45 termination protocol 10 100 base T Cable Distance 450 feet Load Control Contacts Contact Closure Set by user Contact Rating 28Vdc 10A...
Страница 11: ...io or television reception which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or re...
Страница 12: ...hock exists Prior to performing any wiring operations review all contents of the user manual and de energize the MAINS power switch Only qualified personnel should perform installation wiring Installa...
Страница 13: ...s must be installed indoors 6 2 Main Power Board Connections 1 Installing a temporary ground for ESD protection With all circuits de energized connect a temporary protective earth ground con nection f...
Страница 14: ...ing of the enclosure 4 Unit MAINS Wiring The first four positions of terminal block TB1 located at the bottom left corner of the main power board are clearly labeled Phase A B C N neutral Earth Ground...
Страница 15: ...ach of their respective terminal block positions and tightened down verify that each terminal block screw is securely fas tened by gently tugging on each conductor NOTE On Single phase order SP option...
Страница 16: ...Repeat Step F Once the meter displays the correct line voltages and there are no error messages you are ready to connect the current sensors to the meter Before continuing with the installation verify...
Страница 17: ...CLASS 3400 METER 17 62 0391 03 NOTE The meter will be reset later via the software during startup proce dures...
Страница 18: ...3400 meters are supplied with this sensor type 2 Solid core current sensor This sensor does not open and requires the monitored conductor to be removed from the circuit to install the current sensor T...
Страница 19: ...sor connects to two terminals one labeled Black and the other White Current sensors should be connected to the meter one at a time and verified using the current sensor diagnostic program Connect one...
Страница 20: ...2 AWG SENSOR CONNECTIONS W WHITE LEAD B BLACK LEAD NEUTRAL NOT USED IN DELTA SYSTEM LITTLEFUSE PART NUMBER KLDR 100 1 10A 600 VAC INLINE FUSE PER CONDUCTOR LITTLEFUSE PART NUMBER KLDR 100 1 1 1 1 LINE...