CoolPoint

 

 

 

 

®

 

Installation and Operation Manual 

 

Vortex Shedding Flowmeters  

 

Series: 

CP-V8 Battery operated 

 

 
 
 

 

UNIVERSAL FLOW MONITORS, INC.

 

1755 East Nine Mile Road PO Box 249      

Hazel Park, MI 48030-0249                              

TEL (248) 542-9635  FAX (248) 398-4274 
Website: 

http://www.flowmeters.com

 

Содержание CoolPoint CP12-V8

Страница 1: ...ion and Operation Manual Vortex Shedding Flowmeters Series CP V8 Battery operated UNIVERSAL FLOW MONITORS INC 1755 East Nine Mile Road PO Box 249 Hazel Park MI 48030 0249 TEL 248 542 9635 FAX 248 398 4274 Website http www flowmeters com ...

Страница 2: ...TABLE OF CONTENTS 1 PROPRIETARY NOTICE 2 USING THIS MANUAL 2 QUICK SET UP 3 INSTALLATION 4 GENERAL SPECIFICATIONS 5 OPERATION 6 APPLICATIONS 6 MODEL CODES 7 PRESSURE DROP CHARTS 7 DIMENSIONS 8 RMA NOTICE RETURN MERCHANDISE AUTHORIZATION 9 RMA FORM 11 WARRANTY INFORMATION 12 ...

Страница 3: ...roduction other than in connection with the installation operation and maintenance of the equipment described herein Universal Flow Monitors Inc reserves the right to change the information contained in this publication at any time and without prior notice USING THIS MANUAL In order to use this manual you will need the model code that can be found on the nameplate of the flowmeter as shown on the ...

Страница 4: ...FIGURATION OF METER At start up display shows 1 888 8 8 showing that its digits are all functional 18888 8 8 Then model is shown CP6 1 0 Example Run mode achieved Flow rate displayed at 0 flow is 0 0 00 Note that if no adjustments are made GPM displays SELECTING GPM LPM OR CMH Depress MENU button to display flow in GPM LPM or CMH TOTALIZER FUNCTION Depress SELECT button to display total flow To ch...

Страница 5: ...pstream of the meter as well as 5 pipe diameters downstream Isolation ball valves when used should be in the full open position Throttling valves should always be placed downstream of the meter A minimum straight run of 50 pipe diameters is required between an upstream valve and the flowmeter If Teflon tape or pipe sealant is used the user must ensure that no loose parts become wrapped around the ...

Страница 6: ...ax flow Flow Capacities 3 4 25 GPM 95 LPM 1 50 GPM 190 LPM 1 1 2 100 GPM 380 LPM 2 200 GPM 750 LPM Turndown Ratio max to min flow 10 1 standard Process Connections Female NPT with BSPP and BSPT optional Wetted Parts Body is brass or 316 Stainless Steel Sensor is PVDF or PEEK Seals are Viton Display 3 digit LCD 6 digit LCD Totalizer mode only Displays in GPM LPM and CMH Digit height 0 3 Power 3 AA ...

Страница 7: ... low viscosity clean or dirty water like liquids that are compatible with brass PVDF and Viton Metered fluids should not include long fibers or a significant level of abrasive solids Should abrasive wear occur over time bluffs as well as the sensors are replaceable Typical applications include cooling loops using water 50 solutions of glycol and water soluble machine coolant up to 10 These applica...

Страница 8: ...7 CPBatMan080212 UNIVERSAL FLOW MONITORS INC MODEL CODES PRESSURE DROP CHARTS ...

Страница 9: ...8 CPBatMan080212 UNIVERSAL FLOW MONITORS INC DIMENSIONS ...

Страница 10: ...eturned goods must be shipped prepaid or they will be rejected REPAIRABLE MATERIAL Written or verbal authorization to proceed with the repair under an assigned Purchase Order must be received within 30 days of repair quotation If the unit s are repaired the 90 00 evaluation charge will be applied to the quoted repair costs If no repairs are authorized within this 30 day period the customer will be...

Страница 11: ... the customer If no disposition is received by UFM within 30 days the goods will be scrapped and the 90 00 evaluation fee will be billed WARRANTY RETURNS Warranty returns must be shipped prepaid to UFM UFM will review the goods and advise the customer of the evaluation and validity of the warranty claim Valid warranty claims will be repaired or replaced at no charge No evaluation fee will be charg...

Страница 12: ...11 CPBatMan080212 UNIVERSAL FLOW MONITORS INC RMA FORM ...

Страница 13: ...ION WHETHER IN CONTRACT TORT OR OTHERWISE c Disclaimer of Other Warranties The express warranty in this Acknowledgment is in lieu of any other warranty express or implied Without limiting the foregoing UNIVERSAL DISCLAIMS THE IMPLIED WARRANTY OF MERCHANTABILITY AND ANY IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE d Special Note About Fitness for a Particular Purpose This website and other ...

Страница 14: ... packaging waste Nuclear material means source material special material or by product material Nuclear reactor means any apparatus designed or used to sustain nuclear fission in a self supporting chain reaction or to contain a critical mass of fissionable material Property damage includes all forms of radioactive contamination of property Source material special nuclear material and by product ma...