3
1000-07-01GB-10-00
INSTALLATION
INSTALLATION MANUAL
21. Do a second, finer, check of the ballrails.
Use you thumb to feel all the joints of the
rails. If there are any joints that can stop the
balls, grind them gently with a grindstone
and check the joint again, using a ball.
22. Install the wear strips. Lock the screws with
LocTite 243.
23. Fine-polish the rails with the polish wheel.
Make sure that there are no sharp edges on
the small M6 holes.
Notes on the steelworks
Note!
Make sure that the ballrails are correctly ad-
justed, before you adjust the infeed rails. Refer
to the drawing “check list” for the actual freezer
and to service info 12-05-162.
Note!
Do a check of the outer ball chain tensioner’s
freedom of movement, if you have adjusted the
ballrails at the outer transfer point.
Fan driven by-pass air balance
tunnel
Function
The air balance tunnel creates air curtains that
prevents air from blowing out or in through the
openings. The air curtains also prevents the
products from moving while they are inside the
tunnel.
The air flow in the tunnel is created by a fan
which is controlled by a frequency converter.
The speed of the rotation of the motor can be
adjusted from the control panel.
Adjustments
Make sure that the fan wheel rotates in the
correct direction.
Refer to illustration 5.
Check if there is an air flow through the infeed
or outfeed by attaching plastic strips over the
outfeed.
Refer to illustration 6.
Adjust the fan until there is no air flow through
the opening.
3. The air balance tunnel.
Air flow in stack,
downwards
Air flow in stack,
upwards
4. The air flow in the tunnel.
5. The direction of the rotation of the fan wheel.
6. The plastic strips attached over the
infeed or outfeed.
Содержание FoodTech Frigoscandia GYRoCOMPACT M7
Страница 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Страница 2: ...N...
Страница 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Страница 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Страница 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Страница 16: ...10 0000 00 01GB 11 24 SAFETY...
Страница 20: ...SAFETY 4 1000 07 01GB 02 03...
Страница 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Страница 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Страница 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Страница 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Страница 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Страница 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Страница 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Страница 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Страница 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Страница 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Страница 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Страница 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Страница 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Страница 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Страница 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Страница 188: ...SERVICE INFORMATION SERVICE INFO NUMBER 127 EQUIPMENT GENERAL REVISED BY LAR REVISION DATE MAY 2012 14 127 01GB 04...
Страница 194: ...10 221 01GB 03 SERVICE INFO...
Страница 200: ...10 171 01GB 02 SERVICE INFO...
Страница 222: ...172 347 01GB 00 SERVICE INFO...
Страница 230: ...10 039 01GB 03 SERVICE INFORMATION...
Страница 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Страница 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Страница 277: ...9 ALTO Danmark A S...
Страница 288: ...2004 All rights reserved ALTO Danmark A S Blyt kkervej 2 DK 9100 Aalborg No 0617563C May 2004 Printed in Denmark...