1/8
INSTALLATION
1000 - 07 - 01 - 30 - 01
INSTALLATION MANUAL
ADJUSTMENT OF VERTICAL
TAKE-UP, ASCENDING STACK
This document contains information on how to
adjust the vertical take-up. For more information
see equipment drawings.
1. Function of belt take-up
There are two criterias that must be full filed to
make the take-up work in the way it is inteded.
1. The weights must be heavy enough to keep
the belt tense in the take-up.
The most critical point is at the lower fixed
roller (pos 1, illustration 1a). The belt hangs
down in a slope if the belt tension is to low.
2. The weights must keep the wire (pos 2,
illustration 1a) tense all the way through the
take-up’s stroke.
There must always be at least one weight
left on the active side when the take-up is in
its bottom position.
2. Long/ short belt switch
1. Hold the movable shaft in its top position
(see illustration 1a).
Position the top stopper (pos 1, illustration
1a) so that the belt length switch is actuated
when the shaft reaches this position.
2. Hold the moveable shaft in its bottom
position.
Position the bottom stopper (pos 2,
illustration 2a) so that the belt length switch
is actuated when the shaft reaches this
position.
Note: Make sure that the belt links does not
come in contact with the wall or the steel details.
3. Check function of the belt length switch.
2a: Take-up in top position.
Legend illustration a:
1. Top stopper
2. Bottom stopper.
3. Belt length switch.
=S
troke
S
troke
100 mm
2
1
Top
position
Bottom
position
3
2
1
1a: Take-up in bottom position.
Содержание FoodTech Frigoscandia GYRoCOMPACT M7
Страница 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Страница 2: ...N...
Страница 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Страница 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Страница 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Страница 16: ...10 0000 00 01GB 11 24 SAFETY...
Страница 20: ...SAFETY 4 1000 07 01GB 02 03...
Страница 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Страница 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Страница 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Страница 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Страница 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Страница 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Страница 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Страница 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Страница 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Страница 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Страница 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Страница 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Страница 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Страница 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Страница 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Страница 188: ...SERVICE INFORMATION SERVICE INFO NUMBER 127 EQUIPMENT GENERAL REVISED BY LAR REVISION DATE MAY 2012 14 127 01GB 04...
Страница 194: ...10 221 01GB 03 SERVICE INFO...
Страница 200: ...10 171 01GB 02 SERVICE INFO...
Страница 222: ...172 347 01GB 00 SERVICE INFO...
Страница 230: ...10 039 01GB 03 SERVICE INFORMATION...
Страница 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Страница 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Страница 277: ...9 ALTO Danmark A S...
Страница 288: ...2004 All rights reserved ALTO Danmark A S Blyt kkervej 2 DK 9100 Aalborg No 0617563C May 2004 Printed in Denmark...