1
1100-07-01GB-32-03
INSTALLATION
INSTALLATION MANUAL
INSTALLATION INSTRUCTION,
ADF IN GCM FREEZERS
This document, together with the drawing,
gives the complete instructions for installing the
ADF unit.
A. Air feed
B. Drain valve
C. Limit switch
1. Check that pipes, tanks and hoses are
approved for this type of installation with
regards to local safety standards.
2. Install ADF-unit according to ADF drawing,
index 22.
•
Clean pipes from any foreign particles
before assembly.
•
Install pipes and hoses. Make sure that the
ADF conveyor can move without causing
sharp bends or wearing to the hoses.
•
Clean the entire system before manometers
and valves are installed.
3. Install air dryer and air receiver outside the
freezer according to the Dryer and ADF
drawing, index 22.
4. Install compressor unit (when the
compressor is supplied by JBT FoodTech).
5. Install the limit switch according to Proximity
switch on ADF drawing, index 22.
6. Adjust distance between evaporator fins
and ADF nozzles according to illustration 1.
7. Adjust ADF receiver so that the nozzles
point between the pipes in the evaporator
according to illustration 1.
8. Run the air dryer for 24 hours with closed
outgoing valve to activate the desiccant
substance.
Illustration 3: The direction of the ADF
conveyor drive motor is changed by the limit
switch. If the circuit is, for any means, broken
for more than 10 seconds an alarm is
activated and the ADF unit will stop.
C
Illustration 2: Hoses at the ADF receiver.
A
B
Illustration 1: Adjustment of the ADF conveyor.
30 m
m ± 1
0 m
m
Содержание FoodTech Frigoscandia GYRoCOMPACT M7
Страница 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Страница 2: ...N...
Страница 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Страница 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Страница 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Страница 16: ...10 0000 00 01GB 11 24 SAFETY...
Страница 20: ...SAFETY 4 1000 07 01GB 02 03...
Страница 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Страница 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Страница 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Страница 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Страница 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Страница 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Страница 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Страница 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Страница 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Страница 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Страница 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Страница 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Страница 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Страница 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Страница 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Страница 188: ...SERVICE INFORMATION SERVICE INFO NUMBER 127 EQUIPMENT GENERAL REVISED BY LAR REVISION DATE MAY 2012 14 127 01GB 04...
Страница 194: ...10 221 01GB 03 SERVICE INFO...
Страница 200: ...10 171 01GB 02 SERVICE INFO...
Страница 222: ...172 347 01GB 00 SERVICE INFO...
Страница 230: ...10 039 01GB 03 SERVICE INFORMATION...
Страница 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Страница 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Страница 277: ...9 ALTO Danmark A S...
Страница 288: ...2004 All rights reserved ALTO Danmark A S Blyt kkervej 2 DK 9100 Aalborg No 0617563C May 2004 Printed in Denmark...