2
INSTALLATION
1000-07-01GB-37-02
C
h
ec
ke
d
P
ar
ts n
ee
d
ed
N
o
t a
p
p
lic
ab
le
7. Check the following in the ball rail lubrication system:
Check the lubrication interval
Notes:
Oil distribution to all nozzles
Oil leaks
Metering elements
Note 4 or 8 lubrication nozzles
8. Check the following on the belt take-up (vertical/horizontal with weights):
Position and fixing of the weights
(see Service Info)
Notes:
Position and fixing of the stoppers
(see Service Info)
Function of the limit switch
Amount of belt in take-up
9. Check the following on the belt take-up (accumulating):
Function of the limit switch
Notes:
Freedom of the movement from FB length
Amount of accumulated belt in the take-up
(ca 1000 mm)
11. Check the following on the upper belt supportring:
Radial and vertical setting
Notes:
12. Check the following on the outfeed rail:
Cheese cutter, vertical and horizontal position.
See illustr. 13.1.
Notes:
13. Check the following on the air balance tunnel:
Check the hatches on the air balance tunnel
Notes:
Check the fan wheel for vibration and rotation
14. Check the following on the mezzanine floor and sheeting:
Hytrel floor/wall and floor/stack
Notes:
Sealings of the sheeting
15. Check the following on the evaporators and fans:
Attachment of the fan motors
Notes:
Fan motor for abnormal bearing noise
Evaporator for deformed finns
Sealing of the plenum chamber
Function of the fan wheel defrost system
Sealing around the evaporator
Содержание FoodTech Frigoscandia GYRoCOMPACT M7
Страница 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Страница 2: ...N...
Страница 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Страница 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Страница 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Страница 16: ...10 0000 00 01GB 11 24 SAFETY...
Страница 20: ...SAFETY 4 1000 07 01GB 02 03...
Страница 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Страница 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Страница 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Страница 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Страница 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Страница 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Страница 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Страница 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Страница 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Страница 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Страница 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Страница 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Страница 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Страница 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Страница 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Страница 188: ...SERVICE INFORMATION SERVICE INFO NUMBER 127 EQUIPMENT GENERAL REVISED BY LAR REVISION DATE MAY 2012 14 127 01GB 04...
Страница 194: ...10 221 01GB 03 SERVICE INFO...
Страница 200: ...10 171 01GB 02 SERVICE INFO...
Страница 222: ...172 347 01GB 00 SERVICE INFO...
Страница 230: ...10 039 01GB 03 SERVICE INFORMATION...
Страница 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Страница 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Страница 277: ...9 ALTO Danmark A S...
Страница 288: ...2004 All rights reserved ALTO Danmark A S Blyt kkervej 2 DK 9100 Aalborg No 0617563C May 2004 Printed in Denmark...