2
INSTALLATION
1000-07-01GB-10-00
INSTALLATION MANUAL
12. Press down on the ballrails and tighten the
bolts.
Refer to illustration 1.1.
Note!
From this step forward you continue to install
the drive system.
13. Level the ballrail. Use the checklist in the
Site Supervisor Logbook (SSL).
14. Do a check of the radius of the inner ballrail.
Use the Radius Template.
15. If the radius is too uneven (more than 0,5
mm), do one or more of the following:
a. Do a check of the radius to the stands and
adjust them if necessary.
b. Add or remove shims between the ballrail
and the stand-bracket.
c. Add heat, with a TIG welding machine, to
spots that are bent/straight and adjust them.
Remember that the heat will shrink the ma-
terial.
16. Do a check of the transfer point. Make sure
that you have the right link height for meas-
uring the distance between the inner and
outer ballrails.
17. Do a check of the distance between the in-
ner and outer ballrails.
Refer to the drawing
of the rail.
18. Make sure that the joints of the rail is
aligned, both vertically and horizontally.
Refer to illustration 1.2.
19. Weld the joints of the ballrails with a TIG
welding machine. Set the machine to ap-
proximately 100A. Fill all gaps and grooves
with a filler rod.
Note!
Always use a filler rod. If there is no groove that
you can weld in, you must create a groove.
20. Carefully smooth the joints with a rotating
grindstone.
Caution
Be careful so that you do not grind too much or
too little on the joints of the ballrails. If the joints
are not perfect, the balls will stop and cause
tension in the drive system. Imperfect joints can
damage the equipment.
1. The ballrail installation
Contact
Contact
2. The rail installation
Содержание FoodTech Frigoscandia GYRoCOMPACT M7
Страница 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Страница 2: ...N...
Страница 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Страница 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Страница 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Страница 16: ...10 0000 00 01GB 11 24 SAFETY...
Страница 20: ...SAFETY 4 1000 07 01GB 02 03...
Страница 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Страница 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Страница 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Страница 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Страница 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Страница 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Страница 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Страница 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Страница 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Страница 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Страница 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Страница 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Страница 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Страница 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Страница 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Страница 188: ...SERVICE INFORMATION SERVICE INFO NUMBER 127 EQUIPMENT GENERAL REVISED BY LAR REVISION DATE MAY 2012 14 127 01GB 04...
Страница 194: ...10 221 01GB 03 SERVICE INFO...
Страница 200: ...10 171 01GB 02 SERVICE INFO...
Страница 222: ...172 347 01GB 00 SERVICE INFO...
Страница 230: ...10 039 01GB 03 SERVICE INFORMATION...
Страница 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Страница 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Страница 277: ...9 ALTO Danmark A S...
Страница 288: ...2004 All rights reserved ALTO Danmark A S Blyt kkervej 2 DK 9100 Aalborg No 0617563C May 2004 Printed in Denmark...