3
ALTO Danmark A/S
1. Preface
ALTO Danmark A/S congratulates you with your low-pressure foam cleaning system, which fulfils the latest
technical hygiene requirements.
Prior to installation and start of operation please make sure that your operational staff reads the directions for
use. On operation as laid down in the directions for use you will achieve optimum cleaning and hygiene in your
factory and minimum requirement for maintenance and repair work.
The combination of a centrifugal pump and an injector offers the possibilities of automatic and manual:
a) - foam spreading of detergents
b) - rinsing off with water
2. Connections to the Low Pressure System
2.0 Directions for Mounting
The system must be mounted in
frost-free rooms only.
2.1 Water Connection
a) Prior to connection to the sys-
tem the supply pipe should be
rinsed through carefully in order
to remove coarse impurities
and metal shavings.
b) The water connections for the
pump station are at the top of
the system (B on the layout
drawing on page 4-6).
c) It is important to ensure abun-
dant water - no less than 150 l/
min. per pumping unit. To meet
this requirement the diameter
of the supply pipe should be
minimum 1 1/4" (32 mm) at a
water pressure of 3,5 bar, and
at a water pressure lower than
3,5 bar the water pipe should
be minimum 1 1/2" (38 mm).
d) The system is equipped with a
filter on the supply pipe of the
pump.
e) The pressure loss in the supply
pipe should be kept as low as
possible which means that:
- unnecessarily long supply
pipes should be avoided
- low-resistant ball valves
should be used
- fittings with high pressure
loss should be avoided.
f) On pipe mounting care should
be taken that no air locks are
produced.
g) Max. allowed temperature of
inlet water: 70°C.
h) Max. allowed pressure of inlet
water for the pump station: 4
bar.
2.2 Compressed-Air
Connection
a) Prior to connection to the
system the supply pipe should
be rinsed through carefully with
air in order to remove coarse
impurities and metal shavings.
b) The system should be con-
nected to a compressed-air
pipe or a compressor offering:
- an inlet pressure to the low-
pressure system of minimum
5 bar
- a minimum capacity of 500
l/min.
d) The compressed-air pipe
should be connected direct to
the system by a union to facili-
tate dismounting. All systems
are equipped with a closing
valve with 1/4" thread (com-
pressed-air connection for the
pump station) (A on the layout
drawing on page 4-6).
2.3 Connection of Deter-
gents
The User Pack system is pushed
into the holder under the station.
The wide bracket on the right is
intended for detergent and the nar-
row bracket on the left for sanitiser.
The suction pipe, which is fixed
inside the lid, guides the product to
the injector where it is mixed in the
mixing chamber.
The level of detergent/sanitiser is
indicated on the outside level tube.
CAUTION!
When changing between differ-
ent products in the User Pack
system, these must be rinsed
thoroughly with clean water.
Содержание FoodTech Frigoscandia GYRoCOMPACT M7
Страница 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Страница 2: ...N...
Страница 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Страница 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Страница 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Страница 16: ...10 0000 00 01GB 11 24 SAFETY...
Страница 20: ...SAFETY 4 1000 07 01GB 02 03...
Страница 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Страница 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Страница 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Страница 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Страница 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Страница 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Страница 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Страница 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Страница 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Страница 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Страница 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Страница 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Страница 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Страница 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Страница 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Страница 188: ...SERVICE INFORMATION SERVICE INFO NUMBER 127 EQUIPMENT GENERAL REVISED BY LAR REVISION DATE MAY 2012 14 127 01GB 04...
Страница 194: ...10 221 01GB 03 SERVICE INFO...
Страница 200: ...10 171 01GB 02 SERVICE INFO...
Страница 222: ...172 347 01GB 00 SERVICE INFO...
Страница 230: ...10 039 01GB 03 SERVICE INFORMATION...
Страница 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Страница 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Страница 277: ...9 ALTO Danmark A S...
Страница 288: ...2004 All rights reserved ALTO Danmark A S Blyt kkervej 2 DK 9100 Aalborg No 0617563C May 2004 Printed in Denmark...