1
1000-07-01GB-10-00
INSTALLATION
INSTALLATION MANUAL
INSTALLATION AND MOUNTING OF THE
STEEL WORK
This document, together with the drawings, gives the complete
instructions for mounting and installing the steel work.
Installing the Steel work
1. Assemble and install the stands on the empty floor half.
2. Install the internal sheeting. Do not tighten the fasteners.
3. Do a check of the underside of the stand-feet and of the
levels of the drive system.
Refer to the drawing of the stand.
This is done to make sure that the levels of the drive system
will be correct after the equipment has been transported.
4. Adjust the levels of the drive system that are incorrect.
Re-
fer to step 3 and to the drawing of the stand.
5. Install the ballrails to the stands. Use two persons to care-
fully put them in the correct position and bolt them into
place. Do not tighten the bolts.
Caution
Handle the ballrails very carefully and use two
persons when lifting and handling them. The
ballrail are a very important part of the drive
system and they are easily damaged. If the ball-
rail are damaged by incorrect handling, thay are
very hard or impossible to repair.
6. Install the stand extensions.
Note!
Step 6 to step 11 are done to put weight on the drive system
before you can continue to install the drive system.
7. Install the internal mezzanine floor, if it is equipped, and the
support ring.
8. Install the vertical sheeting and the mezzanine floor. Do not
tighten the fasteners.
9. Install the internal rails.
10. Install the air balance tunnel and the tunnel extension.
11. Install the Equalizing Duct (EQD).
Содержание FoodTech Frigoscandia GYRoCOMPACT M7
Страница 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Страница 2: ...N...
Страница 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Страница 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Страница 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Страница 16: ...10 0000 00 01GB 11 24 SAFETY...
Страница 20: ...SAFETY 4 1000 07 01GB 02 03...
Страница 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Страница 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Страница 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Страница 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Страница 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Страница 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Страница 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Страница 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Страница 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Страница 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Страница 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Страница 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Страница 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Страница 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Страница 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Страница 188: ...SERVICE INFORMATION SERVICE INFO NUMBER 127 EQUIPMENT GENERAL REVISED BY LAR REVISION DATE MAY 2012 14 127 01GB 04...
Страница 194: ...10 221 01GB 03 SERVICE INFO...
Страница 200: ...10 171 01GB 02 SERVICE INFO...
Страница 222: ...172 347 01GB 00 SERVICE INFO...
Страница 230: ...10 039 01GB 03 SERVICE INFORMATION...
Страница 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Страница 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Страница 277: ...9 ALTO Danmark A S...
Страница 288: ...2004 All rights reserved ALTO Danmark A S Blyt kkervej 2 DK 9100 Aalborg No 0617563C May 2004 Printed in Denmark...