6
171-01GB-02
SERVICE INFO
Test instructions
The use of a tester type HT2034 (Toleka) is recommended for
the implementation of the following tests.
Caution
The machine must be prepared and a number
of safety precautions taken prior to testing:
•
block unauthorized access to the machine
•
switch off the main supply
•
ensure that all fuses and switches are in the “ON” position
•
ensure that all contactors in the power circuits are mechani
-
cally actuated, the main contactors are to be closed
•
ensure that all caps/electrical plugs are connected
•
disconnect/bypass any frequency converters
•
short-circuit all transformers primary to secondary (only for
those which have a secondary voltage higher than PELV
voltage in the case of normal operation
A test sheet for these measurements is to be drawn up and
processed as above. A general form for this is appended to the
end of these instructions.
Continuity of the protective bounding circuit
The protective bounding circuit is to be examined visually and a
check made on the tightening of the connections.
The protective bounding circuit comprises:
•
PE connections in the control panel
•
conductive structural parts of the control panel and the ma
-
chine
•
the protective conductors that belong to the machine equip
-
ment
•
GC with plastic ball drive system:
The belt stack in GC:s with plastic balls is electrically iso
-
lated from the rest of the machine.
All electrical equipment is isolated from the stack by the
plastic balls and the plastic sprockets.
Therefore it is not considered to be a part of the bounding
circuit.
Содержание FoodTech Frigoscandia GYRoCOMPACT M7
Страница 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Страница 2: ...N...
Страница 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Страница 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Страница 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Страница 16: ...10 0000 00 01GB 11 24 SAFETY...
Страница 20: ...SAFETY 4 1000 07 01GB 02 03...
Страница 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Страница 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Страница 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Страница 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Страница 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Страница 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Страница 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Страница 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Страница 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Страница 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Страница 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Страница 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Страница 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Страница 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Страница 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Страница 188: ...SERVICE INFORMATION SERVICE INFO NUMBER 127 EQUIPMENT GENERAL REVISED BY LAR REVISION DATE MAY 2012 14 127 01GB 04...
Страница 194: ...10 221 01GB 03 SERVICE INFO...
Страница 200: ...10 171 01GB 02 SERVICE INFO...
Страница 222: ...172 347 01GB 00 SERVICE INFO...
Страница 230: ...10 039 01GB 03 SERVICE INFORMATION...
Страница 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Страница 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Страница 277: ...9 ALTO Danmark A S...
Страница 288: ...2004 All rights reserved ALTO Danmark A S Blyt kkervej 2 DK 9100 Aalborg No 0617563C May 2004 Printed in Denmark...