SERVICE INFORMATION
SERVICE INFO NUMBER:
342
EQUIPMENT:
GENERAL GC FRIGoDRIVE
REVISED BY:
GÖRAN GRAMBY
REVISION DATE:
APRIL, 2014
4
342-01GB-00
Outgoing rail
Rail 1 must be in position before adjusting outgoing rail.
1. Make sure rail 3 is level. Also check the distance between
incoming rail and rail 3 at the transfer point. It should be
equal to the link height.
2. Make sure that the drive station is level with rail 3 at the
transfer point.
3. Tac weld the outgoing rail in position.
4. Measure the distance between rail 1 and outgoing rail at
3 positions according to picture. The outgoing rail shall be
horizontal at all points.
- At transfer point(A)
- At connection to horse shoe rail (B)
- In between these 2 points (C)
Picture 6. Outgoing rails setup A+B / 2 = C
5. Use a square tube on top of the outer and inner transfer
rails as base for the measurements.
Picture 7. Measuring with a square tube as base
6. The correct measure for point C = (A+B)/2.
Tolerance is C +0/-1 (i.e. downwards is better)
7. If required, adjust the outgoing rail until the correct measure
of C is achieved.
Содержание FoodTech Frigoscandia GYRoCOMPACT M7
Страница 1: ...0 INSTALLATION MANUAL Frigoscandia GYRoCOMPACT M7 Spiral Freezer...
Страница 2: ...N...
Страница 4: ...INSTALLATION 2 2 INTRODUCTION 02 INSTALLATION MANUAL...
Страница 6: ...2 2 0000 07 01 01 00 INSTALLATION MANUAL INSTALLATION...
Страница 8: ...2 2 0000 07 01 02 00 INSTALLATION MANUAL INSTALLATION...
Страница 16: ...10 0000 00 01GB 11 24 SAFETY...
Страница 20: ...SAFETY 4 1000 07 01GB 02 03...
Страница 34: ...6 INSTALLATION PREPARATIONS 1000 07 01GB 05 03...
Страница 42: ...8 DELIVERY INFORMATION 0000 03 01GB 11 09...
Страница 44: ...2 INSTALLATION 1000 07 01GB 07 01 INSTALLATION MANUAL...
Страница 48: ...2 INSTALLATION 1000 07 01GB 09 03 INSTALLATION MANUAL...
Страница 54: ...2 INSTALLATION 1000 07 01GB 12 00 INSTALLATION MANUAL...
Страница 58: ...4 INSTALLATION 1000 07 01GB 13 01 INSTALLATION MANUAL...
Страница 62: ...2 INSTALLATION 1000 07 01GB 15 00 INSTALLATION MANUAL...
Страница 70: ...2 INSTALLATION INSTALLATION MANUAL 1000 07 01GB 18 01...
Страница 72: ...2 INSTALLATION 1000 07 01GB 20 00 INSTALLATION MANUAL...
Страница 78: ...6 INSTALLATION 1000 07 01GB 22 03 INSTALLATION MANUAL...
Страница 90: ...4 INSTALLATION 1000 07 01GB 29 00 INSTALLATION MANUAL...
Страница 110: ...6 INSTALLATION 1000 07 01GB 25 01 INSTALLATION MANUAL...
Страница 128: ...18 INSTALLATION 1000 07 01GB 26 06...
Страница 144: ...2 INSTALLATION 1000 07 01GB 19 00 INSTALLATION MANUAL...
Страница 152: ...2 INSTALLATION 1000 07 01GB 36 00 INSTALLATION MANUAL...
Страница 188: ...SERVICE INFORMATION SERVICE INFO NUMBER 127 EQUIPMENT GENERAL REVISED BY LAR REVISION DATE MAY 2012 14 127 01GB 04...
Страница 194: ...10 221 01GB 03 SERVICE INFO...
Страница 200: ...10 171 01GB 02 SERVICE INFO...
Страница 222: ...172 347 01GB 00 SERVICE INFO...
Страница 230: ...10 039 01GB 03 SERVICE INFORMATION...
Страница 256: ...172 CORRECTIVEMAINTENANCE 1000 06 01GB 10 11...
Страница 269: ...Automatic Pump Station PZC M1 PZE M2 CIP M3 Directions for use 3 19 EN...
Страница 277: ...9 ALTO Danmark A S...
Страница 288: ...2004 All rights reserved ALTO Danmark A S Blyt kkervej 2 DK 9100 Aalborg No 0617563C May 2004 Printed in Denmark...