2.3 Overview of Function Code
C
hap.
2
FUN
CT
IO
N
C
O
D
E
S
As it can be observed, as soon as RUN command is ON (
FWD
or
REV
) and EN terminals are active,
As it can be observed, as soon as RUN command is ON (
FWD
or
REV
) and EN terminals are active,
SCC
signal is ON. Therefore from this moment short circuit contact is opened. On the other hand,
IGBT’s drivers cannot be ON until inverter doesn’t receive short circuit contacts feedback (
SCCF
).
By means of this, inverter damage can be avoided. As soon as
SCCF
signal is received (contact
feedback) and timer
L121
is elapsed, inverter can aply voltage at the output as no short circuit is
present.
At stopping,
SCC
is not OFF until IGBT’s drivers are OFF and time L86 has elapsed. By means of
this, inverter ensures that when short circuit is applied, IGBT’s drivers are OFF, and brake is closed.
brake is closed, no regenerated energy can flow from the motor.
In figure 2, an emergency stop timing sequence is shown.
Speed
0
High speed
Run command
(FWD, REV)
ON
SCC
Short-circuit contact
Open
SCCF
L120
L86
IGBT’s gate
Active
ON
EN1&EN2
ON
ON
L120
BRKS
ON
L82
Safety chain is opened.
Figure 2. Emergency stop timing sequence.
In figure 3, a starting sequence with feedback contacts timing problem is shown.
Inverter trips SCA
.
Speed
0
Run command
(FWD, REV)
ON
SCC
Short-circuit contact
SCCF
L120
IGBT’s gate
ON
EN1&EN2
ON
ON
BRKS
Alarm
ON
Figure 3. Starting sequence with feedback contacts timing problem (
SCA
alarm).
As it can be observed, inverter waits L121 time in order to receive
SCCF
signal (contact feedback).
When L121 time finished, no feedback is received from shor circuit contacts, therefore inverter trips
SCA alarm. At same time, because constant feedback is not received, IGBT’s drivers are not
activated and
SCC
output signal goes to OFF state.
2-189
Содержание Frenic lift
Страница 1: ...LM2A series Reference Manual INR SI47 1909a E...
Страница 7: ......
Страница 13: ......
Страница 51: ...2 38...
Страница 221: ......
Страница 242: ...3 4 Programming Mode Chap 3 OPERATION USING TP A1 LM2 Figure 3 14 Screen transition for Op Monitor display example 3 21...
Страница 252: ......
Страница 254: ...URL http www fujielectric com...