k
×
speed
Rated
×
voltage
Rated
×
2
]
5[
-
tage
Batter vol
operation
battery
during
ramp)
-
(pre
speed
Reference
V
≤
Reference speed (pre-ramp) during battery operation :
Setting of C03 in the multistep speed operation
(when the manual speed (middle) is selected)
Base speed :
F04
Rated voltage :
F05 (motor rated voltage (V))
k:
Safety coefficient (less than 1 and may be about 0.8)
■
Connection diagram in case of batteries and FRN0032LM2A-4_ or below:
■
Connection diagram in case of batteries and FRN0039LM2A-4_ or above:
73X
MC2
R,S,T
N(-)
Battery
R0,T0
Control circuit
UPS
etc.
MC1
M
Edc
Converter
Power
supply
Inverter
+
■
Connection diagram in case of UPS:
73X
MC2
R,S,T
N(-)
Battery
+24V
Control circuit
MC1
M
Edc
Converter
Power
supply
Inverter
+
+
-
Battery
+
-
-24V
73X
MC2
R,S,T
N(-)
UPS
Control circuit
MC1
M
Edc
Converter
Power
supply
Inverter
+
2-78
Содержание Frenic lift
Страница 1: ...LM2A series Reference Manual INR SI47 1909a E...
Страница 7: ......
Страница 13: ......
Страница 51: ...2 38...
Страница 221: ......
Страница 242: ...3 4 Programming Mode Chap 3 OPERATION USING TP A1 LM2 Figure 3 14 Screen transition for Op Monitor display example 3 21...
Страница 252: ......
Страница 254: ...URL http www fujielectric com...