
Installation and Operation Guide
ED-DT318B
Drive Train Systems with Traction Control, Inverter/Controller, and Motor with 2 Speed Transmission
BC353060341319en-000101
Revision D
© Danfoss | November 2020 | 36
Classified as Business
1.
Orient rotor position cable connector to the mating connector on the motor or the controller and rotate
cable until keyway allows insertion.
Figure 3.5: Signal Cable Connection – Insertion
2.
Screw knurled connection nut clockwise. At about 3 turns some resistance will be felt. This is the nut
coming into contact with the sealing O-ring. The connector is not fully seated.
Figure 3.6: Signal Cable Connection – Tightening
3.
Continue to tighten knurled nut until O-ring is covered, and increased torque is required, (about 2
turns) this is the point when the cable connector is fully seated to the mating connector.
Figure 3.7: Signal Cable Connection – Final Torque
4.
Torque the mated connector to 20-30 in lbs. This is about 2-3X the torque that can be achieved by hand.
Содержание ED-DT318B
Страница 185: ......