CELL-DYN
3000 System Operator’s Manual
10-35
9140240E — May 1995
Chapter 10
Troubleshooting
5.
Remove the four thumbscrews from the sides of the Sample Loader
tower and remove the cover.
6.
Remove the two thumbscrews from the Sample Loader manual
keyboard cover and remove it. (Refer to
7.
Press and hold the MAN and START keys on the manual keyboard
at the same time and turn the power ON. The green light on the
manual keyboard indicates that the manual mode is ON.
8.
Repeatedly press the N-down key until the needles are moved
approximately half the way down. Turn the Sample Loader power
switch OFF.
9.
Use the Allen wrench to loosen the locking screw on the
appropriate mounting bracket. (See
remove the screw.
10.
Disconnect the tubing from the appropriate needle.
NOTE: Slide the silicon tubing sleeve onto the aspirate tubing
before disconnecting it.
11.
Remove the aspiration needle by pulling it up through the wash
block and the mounting bracket.
CAUTION: Use care when removing the needle to avoid
puncture.
12.
Insert the new aspiration or vent needle through the mounting
bracket and down through the wash block until the wide collar at
the top of the needle is flush with the top of the mounting bracket.
13.
Turn the aspiration needle until the hole in the needle faces the
waste tubing port. (See
.) The orientation of the hole in
the vent needle is not important.
14.
Tighten the locking screw in the appropriate mounting bracket.
15.
Reconnect the tubing to the top of the needle.
NOTE: When connected, the aspirate tubing must be placed at
least 1/4 inch over the top of the needle to cover it. The silicon
tubing sleeve must slide over this connection for a proper seal.
16.
Reconnect the sample aspiration tubing to the Analyzer.
17.
Turn the Sample Loader power switch ON.
Search
Go Back
Book TOC
Содержание CELL-DYN 3000
Страница 31: ...10 CELL DYN 3000 System Operator s Manual 9140240E May 1995 NOTES Search Go Back Book TOC ...
Страница 265: ...6 10 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Calibration Chapter 6 NOTES Search Go Back Book TOC ...
Страница 287: ...6 32 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Calibration Chapter 6 NOTES Search Go Back Book TOC ...
Страница 313: ...6 58 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Calibration Chapter 6 NOTES Search Go Back Book TOC ...
Страница 347: ...6 92 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Calibration Chapter 6 NOTES Search Go Back Book TOC ...
Страница 351: ...7 2 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Quality Control Chapter 7 NOTES Search Go Back Book TOC ...
Страница 369: ...7 20 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Quality Control Chapter 7 NOTES Search Go Back Book TOC ...
Страница 371: ...7 22 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Quality Control Chapter 7 NOTES Search Go Back Book TOC ...
Страница 387: ...9 6 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Maintenance Chapter 9 NOTES Search Go Back Book TOC ...
Страница 405: ...9 24 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Maintenance Chapter 9 NOTES Search Go Back Book TOC ...
Страница 431: ...10 2 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Troubleshooting Chapter 10 NOTES Search Go Back Book TOC ...
Страница 473: ...10 44 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Troubleshooting Chapter 10 NOTES Search Go Back Book TOC ...
Страница 495: ...10 66 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Troubleshooting Chapter 10 NOTES Search Go Back Book TOC ...
Страница 509: ...10 80 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Troubleshooting Chapter 10 NOTES Search Go Back Book TOC ...
Страница 535: ...12 16 CELL DYN 3000 System Operator s Manual 9140240E May 1995 Sample Loader Chapter 12 NOTES Search Go Back Book TOC ...
Страница 542: ......