Maintenance
Model 6DS-SP Planarizer
9 - 88
Version 4.0 - February 1998
B.
CHECK CURRENT CALIBRATION
Note:
The carriers will fit so smoothly into the load station rings that the ring
will become a part of the spindle and carrier; the load station “bucket”,
however, can be moved independently.
1.
At Page 1 of the Manual Control Menu select Robot Move and choose
Left Send to move the robot out of the way.
2.
Select Bridge Move and choose Load to move the bridge to its load
position.
3.
At Page 2 of the Manual Control Menu select Left Spindle Up/Down
and choose Down to lower the left spindle.
4.
Select Right Spindle Up/Down and choose Down to lower the right
spindle.
5.
Open the Left Front Operator Door.
6.
Hold a straight edge vertically against the intersection of the left carrier
and load ring edges.
7.
Look for light between the carrier or load ring and the straight edge.
8.
For each load station, using a precision scale, measure the light gap
between the carrier and load ring and record:
a.
At the left and right sides of each load station.
b.
At the front and back of each load station.
c.
For each load station, record each gap and its direction.
GOAL:
There should be a .125 in. (1/8 in.) gap between the
load ring and bucket at the left, right, front, and rear.
d.
If the goal is met, no adjustment is needed. Skip to the When A
Satisfactory Adjustment Is Achieved, below.
e.
If the goal is not met, make the adjustment as detailed in the
Alignment Procedure section below.
Summary of Contents for 6DS-SP
Page 1: ......
Page 19: ...Introduction INTRODUCTION...
Page 58: ......
Page 59: ...Introduction ACHINE ESCRIPTION...
Page 108: ...Introduction PERATOR UNCTIONS...
Page 131: ...Strasbaugh Operator Functions Version 4 0 February 1998 3 23 Figure 3 4 Menu Selection...
Page 134: ...Operations Model 6DS SP Planarizer 3 26 Version 4 0 February 1998 Figure 3 5 Home Machine Menu...
Page 145: ...Strasbaugh Operator Functions Version 4 0 February 1998 3 37 Figure 3 8 Recipe Management Menu...
Page 150: ...Operations Model 6DS SP Planarizer 3 42 Version 4 0 February 1998 Figure 3 9 Home Machine Menu...
Page 203: ...Introduction ACHINE ETUP...
Page 210: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 7 Figure 4 2 Slurry Flush Menu...
Page 216: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 13 Figure 4 4 Polish Parameters Menu...
Page 254: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 51 Figure 4 13 Password Menu...
Page 258: ...Introduction TROUBLESHOOTING...
Page 267: ...Strasbaugh Troubleshooting Version 4 0 February 1998 5 9 Figure 13 1 Alarm Log Menu...
Page 326: ...Introduction APPENDICES...
Page 329: ...Introduction LECTRIAL NPUT UTPUT...
Page 331: ...Operations Model 6DS SP Planarizer This page intentionally left blank...
Page 332: ......
Page 356: ...Introduction REVISIONS...
Page 357: ...Introduction INTRODUCTION...
Page 396: ......
Page 407: ...Strasbaugh Installation Version 4 0 February 1998 Update 11 06 01 2 11 U...
Page 421: ...Introduction HYSICAL ESCRIPTION...
Page 444: ...Introduction ECHANICAL ESCRIPTION...
Page 463: ...Introduction CONTROL SYSTEM DESCRIPTION...
Page 470: ...Introduction OWER ISTRIBUTION...
Page 479: ...Introduction LUMBING ESCRIPTION...
Page 490: ...Introduction REVENTATIVE AINTENANCE CHEDULES...
Page 507: ...Introduction ECHANICAL AINTENANCE ROCEDURES...
Page 516: ......
Page 691: ...Introduction OFTWARE ALIBRATION ROCEDURES...
Page 862: ...Introduction NEUMATIC DJUSTMENTS...
Page 897: ...Introduction OFTWARE ONTROL OMPUTER AINTENANCE...
Page 912: ...Introduction TROUBLESHOOTING...
Page 921: ...Strasbaugh Troubleshooting Version 4 0 February 1998 13 9 Figure 13 1 Alarm Log Menu...
Page 981: ......
Page 1005: ...Introduction APPENDICES...
Page 1006: ...Introduction ALIBRATION ARIABLES IST...
Page 1008: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1094: ...STRASBAUGH INC May 31 2001 Ver 4 37 6DS SP User Interface Reference Page 21...
Page 1103: ...STRASBAUGH INC Page 30 6DS SP User Interface Reference May 31 2001 Ver 4 37...
Page 1467: ...Introduction SSEMBLY RAWINGS...
Page 1469: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1470: ...Introduction ARTS IST...
Page 1471: ...Introduction LECTRICAL NPUT UTPUT...
Page 1473: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1474: ...Introduction PTIONS...
Page 1476: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix D Options...
Page 1477: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1478: ...Introduction AINTENANCE OG HEETS...
Page 1479: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix E Maintenance Log Sheets...
Page 1480: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1481: ......
Page 1482: ......
Page 1483: ......
Page 1484: ......
Page 1485: ......
Page 1508: ...Introduction APPENDICES...
Page 1509: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix F Manufacturer Data Attached CD...
Page 1510: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1511: ......
Page 1534: ...Introduction APPENDICES...
Page 1535: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix F Part 2 Manufacturers Data Sheets...
Page 1536: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1537: ......
Page 1560: ...Introduction APPENDICES...
Page 1562: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...