Auto Cycle Action if Leak Feature:
Version 4.20 adds a feature that will cause a "finish cycle" if any of three possible fluid
leak sources are detected. The finish cycle lets the current wafers finish processing but
will not start any new wafers. The leak sources are the primary table drain pan overflow,
the drip pans at the bottom of the machine, and the optional external leak detector input.
Calibration Variable 53 "Action if leak (0-no,1-finish)" enables the feature.
If set to "0", the Auto Cycle will continue and attempt to polish subsequent wafers.
If set to "1", any leak will both cause an alarm and automatically set the "finish cycle"
mode to finish all wafers in process but not start any new ones from the send cassettes.
Automatic DI/Slurry Shutoff Feature:
Version 4.20 adds a feature that will turn off the slurry valves, stop slurry pumps, and
turn off the optional master DI water valve if a leak occurs.
Calibration Variable 54 "Slry/DI off w/leak(0-no,1-yes)" enables the feature.
If set to "0", a leak will cause an alarm only.
If set to "1", any leak will both cause an alarm and automatically cause all slurry shutoff
valves to close, all slurry pumps to stop, and the optional master DI water valve to close.
However, this automatic shutoff will not occur during idling unless Calibration Variable
191 "Abort idle if leak(0-no, 1-yes)" is also set to "1".
Externally Detected Leak Input:
Version 4.20 adds support for an externally detected leak input (Input 69 "Ext leak
detect"). This input can be controlled by an external system which is monitoring its own
leak sensors located in or around the 6DS-SP.
Calibration Variable 190 "Ext. leak detect (0-no, 1-yes)" enables the feature.
If set to "0", the external leak detect input will be ignored. Also, if digital mounting rack
"6MR" is not installed, this variable must be set to "0".
If set to "1", the external leak detect input will be monitored for the purposes of an alarm
showing "EXTERNAL LEAK DETECT". Also, it may be used along with other leak
detection features depending on the settings of variable 53 "Action if leak (0-no,1-
finish)", variable 54 "Slry/DI off w/leak(0-no,1-yes)", and variable 191 "Abort idle if
leak(0-no,1-yes)".
Internal Leak Detect Output:
Summary of Contents for 6DS-SP
Page 1: ......
Page 19: ...Introduction INTRODUCTION...
Page 58: ......
Page 59: ...Introduction ACHINE ESCRIPTION...
Page 108: ...Introduction PERATOR UNCTIONS...
Page 131: ...Strasbaugh Operator Functions Version 4 0 February 1998 3 23 Figure 3 4 Menu Selection...
Page 134: ...Operations Model 6DS SP Planarizer 3 26 Version 4 0 February 1998 Figure 3 5 Home Machine Menu...
Page 145: ...Strasbaugh Operator Functions Version 4 0 February 1998 3 37 Figure 3 8 Recipe Management Menu...
Page 150: ...Operations Model 6DS SP Planarizer 3 42 Version 4 0 February 1998 Figure 3 9 Home Machine Menu...
Page 203: ...Introduction ACHINE ETUP...
Page 210: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 7 Figure 4 2 Slurry Flush Menu...
Page 216: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 13 Figure 4 4 Polish Parameters Menu...
Page 254: ...Strasbaugh Machine Setup Version 4 0 February 1998 4 51 Figure 4 13 Password Menu...
Page 258: ...Introduction TROUBLESHOOTING...
Page 267: ...Strasbaugh Troubleshooting Version 4 0 February 1998 5 9 Figure 13 1 Alarm Log Menu...
Page 326: ...Introduction APPENDICES...
Page 329: ...Introduction LECTRIAL NPUT UTPUT...
Page 331: ...Operations Model 6DS SP Planarizer This page intentionally left blank...
Page 332: ......
Page 356: ...Introduction REVISIONS...
Page 357: ...Introduction INTRODUCTION...
Page 396: ......
Page 407: ...Strasbaugh Installation Version 4 0 February 1998 Update 11 06 01 2 11 U...
Page 421: ...Introduction HYSICAL ESCRIPTION...
Page 444: ...Introduction ECHANICAL ESCRIPTION...
Page 463: ...Introduction CONTROL SYSTEM DESCRIPTION...
Page 470: ...Introduction OWER ISTRIBUTION...
Page 479: ...Introduction LUMBING ESCRIPTION...
Page 490: ...Introduction REVENTATIVE AINTENANCE CHEDULES...
Page 507: ...Introduction ECHANICAL AINTENANCE ROCEDURES...
Page 516: ......
Page 691: ...Introduction OFTWARE ALIBRATION ROCEDURES...
Page 862: ...Introduction NEUMATIC DJUSTMENTS...
Page 897: ...Introduction OFTWARE ONTROL OMPUTER AINTENANCE...
Page 912: ...Introduction TROUBLESHOOTING...
Page 921: ...Strasbaugh Troubleshooting Version 4 0 February 1998 13 9 Figure 13 1 Alarm Log Menu...
Page 981: ......
Page 1005: ...Introduction APPENDICES...
Page 1006: ...Introduction ALIBRATION ARIABLES IST...
Page 1008: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1094: ...STRASBAUGH INC May 31 2001 Ver 4 37 6DS SP User Interface Reference Page 21...
Page 1103: ...STRASBAUGH INC Page 30 6DS SP User Interface Reference May 31 2001 Ver 4 37...
Page 1467: ...Introduction SSEMBLY RAWINGS...
Page 1469: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1470: ...Introduction ARTS IST...
Page 1471: ...Introduction LECTRICAL NPUT UTPUT...
Page 1473: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1474: ...Introduction PTIONS...
Page 1476: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix D Options...
Page 1477: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1478: ...Introduction AINTENANCE OG HEETS...
Page 1479: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix E Maintenance Log Sheets...
Page 1480: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1481: ......
Page 1482: ......
Page 1483: ......
Page 1484: ......
Page 1485: ......
Page 1508: ...Introduction APPENDICES...
Page 1509: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix F Manufacturer Data Attached CD...
Page 1510: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1511: ......
Page 1534: ...Introduction APPENDICES...
Page 1535: ...Strasbaugh Appendices Version 4 0 February 1998 Appendix F Part 2 Manufacturers Data Sheets...
Page 1536: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...
Page 1537: ......
Page 1560: ...Introduction APPENDICES...
Page 1562: ...Maintenance Model 6DS SP Planarizer This page intentionally left blank...