Diagnosis / faults and alarms
10.2 Diagnosis
Drive converter cabinet units
Operating Instructions, 07/07, A5E00288214A
415
CBE20 – Communication Board Ethernet (option G33)
Table 10-9 Description of the LEDs on the CBE20
LED
Color
State
Description
---
OFF
The electronics power supply is missing or lies outside permissible
tolerance range.
Link port
Green
Steady light
A different device is connected to port x and a physical connection exists.
---
OFF
The electronics power supply is missing or lies outside permissible
tolerance range.
Activity
port
Yellow
Steady light
Component active (DC link discharge via braking resistor in progress).
---
OFF
If the link port LED is green:
The CBE20 is operating normally, data is being exchanged with the
configured IO Controller.
Flashing
- The response monitoring time has elapsed.
- Communication has been interrupted.
- The IP address is incorrect.
- Incorrect or missing configuration.
- Incorrect parameterization.
- Incorrect or missing device name.
- IO Controller not present/switched off but Ethernet connection present.
- Other CBE20 errors
Fault
Red
Steady light
CBE20 bus fault
- No physical connection to a subnet/switch.
- Incorrect transmission rate.
- Full-duplex transmission not activated.
---
OFF
If the link port LED is green:
Control Unit task system is not synchronized with the IRT clock. An
internal substitute clock is generated.
Flashing
Control Unit task system has synchronized with the IRT clock and data is
being exchanged.
Sync
Green
Steady light
Task system and MC-PLL have synchronized with the IRT clock.
---
OFF
Electronic power supply is missing or outside permissible tolerance
range.
Communication Board either defective or not inserted.
Steady light
Communication Board is ready and cyclic communication is taking place.
Green
0.5 Hz flashing
light
The Communication Board is ready, but cyclic communication is not yet
taking place.
Possible causes:
- At least one fault is pending.
- Communication is being established.
Steady light
Cyclic communication via PROFINET has not yet been established.
However, acyclic communication is possible. SINAMICS is waiting for a
parameterization/configuration telegram.
OPT on
the Control
Unit
Red
0.5 Hz flashing
light
The firmware download to the CBE20 has failed.
Possible causes:
- The CBE20 is defective.
- The CompactFlash card for the Control Unit is defective.
In this state, the CBE20 cannot be used.