
Commissioning
5.5 First commissioning
Drive converter cabinet units
Operating Instructions, 07/07, A5E00288214A
165
CAUTION
Once the encoder has been commissioned, the supply voltage (5/24 V) set for the encoder
is activated on the SMC30 module. If a 5 V encoder is connected and the supply voltage
has not been set correctly via p0404 (bit 20 = "Yes", bit 21 = "No"), the encoder may be
damaged.