ULN-R Installation Guide
511
and dab them with caulk. Fit the ribbon cable jumper between the mic pre and DB25 connector
board, making sure that the pins are lined up.
Figure F.16: Installing the Ch. 5-8 Mic Pre Board
The installation is finished! Replace the top cover, and replace the six crews on the top of the case. Then
replace the screws on the left and right side, remembering to use the longer screws on the rack ears. It
sometimes helps to squeeze the top and bottom of the case together when replacing the side screws, to
ensure that the outer holes line up with the threaded inserts.
Once you have reassembled the unit, connect it to your computer and power it up. When looking at an
Analog input in MIOConsole3d, you will now have the “Mic” and “Mic S/R” selections as input choices,
as well as phantom power control.
If you have any questions about the installation process, contact [email protected].