NO TE
● The unit can be grounded using either a ground lug or a ground cable.
● There are two ground points for the unit. Select the nearest one.
Figure 4-7 Installing the ground cable or ground lug
(1) Ground cable
(2) Ground lug
----End
Follow-up Procedure
After the unit is hoisted and installed, verify the installation to ensure normal use
of products and smooth subsequent installation.
Table 4-5 Post-installation checklist
No.
Item
Check Method
Expected Result
1
Contact between
units and concrete
platforms
Observe.
The units are in close
contact with and
evenly supported by
the concrete
platforms.
FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
4 System Installation (Building Scenario)
Issue 03 (2021-04-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
44