Figure 4-5 Hoisting a unit
Step 6 Secure the unit to the concrete platforms using four right angle brackets.
1. Secure the right angle brackets to the unit using common bolts.
2. Secure the right angle brackets to the concrete platforms using expansion
bolts.
Figure 4-6 Securing the unit to the concrete platforms
Step 7 Install the equipotential ground cable or ground lug.