G.3 Physical Ports of Cables
Figure G-9 Cable ports on an electric control box (front view)
(1) Primary power switch QF1
(2) Backup power switch QF2
(3) Reserved terminal block and water sensor
port
(4) Transformer TC-1 (reserved)
Figure G-10 Dimensions of cable holes on a power distribution box (bottom view,
unit: mm)
(1) Primary power cable hole
(2) Backup power cable hole
(3) Reserved customer signal
cable hole
FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual
G Physical Ports (FDC Scenario)
Issue 03 (2021-04-20) Copyright © Huawei Digital Power Technologies Co., Ltd.
256