
6.3 Measurement examples
92
Measuring the internally powered equipment 2
1.
Press
in the measurement screen and
select
under measured terminal.
2.
Connect test leads to terminals T2.
3.
Position the tip of the test lead connected to termi-
nal T2 on the applied part of the equipment under
test.
4.
During manual measurement, patient leakage cur-
rent (patient connection - earth) measurement
starts upon return to the measurement screen.
Measurement conditions can be changed during
measurement.
See
"6.1 Making manual measurements" (p. 79)
During automatic measurements,
becomes
available upon return to the measurement screen.
Press
to start patient leakage current
(patient connection - earth) measurement.
Only
is available during automatic measure-
ments.
1
1
2
3
Terminal T2 and applied part
When the instrument is set to internally powered equipment, even if the breaker
is turned On, the power supply to the equipment under test will be interrupted
(grounding connection will also be interrupted).
Summary of Contents for ST5540
Page 2: ......
Page 6: ...Contents iv Index i ...
Page 29: ...23 2 Chapter 2 Instrument Labels and Screens Instrument Labels and Screens Chapter 2 ...
Page 80: ...4 8 Changing the Measurement Method Auto Manual 74 ...
Page 121: ...115 8 9 7 Chapter 7 Instrument System Settings Instrument System Settings Chapter 7 ...
Page 144: ...7 14 Setting the Backlight 138 ...
Page 284: ...10 14 Measurement Networks 278 ...
Page 290: ...11 4 Instrument Disposal 284 ...
Page 320: ...Appendix4 External Dimensions A30 ...
Page 323: ......
Page 324: ......
Page 325: ......
Page 326: ......