
6.3 Measurement examples
83
6
Chapt
er 6 Measureme
nt
s
1.
Connect the instrument and the equipment under test.
See
"3.3 Connecting equipment under test to the instrument" (p. 36)
2.
During manual measurements,
Earth leakage current
measurement starts upon returning to the
measurement screen.
Measurement conditions can be changed during measurement.
See
"6.1 Making manual measurements" (p. 79)
During automatic measurements,
becomes available upon return to the measurement
screen. Press
to start
Earth leakage current
measurement.
See
Only
is available during automatic measurements.
6.3 Measurement examples
Earth leakage current measurement
1
2
Summary of Contents for ST5540
Page 2: ......
Page 6: ...Contents iv Index i ...
Page 29: ...23 2 Chapter 2 Instrument Labels and Screens Instrument Labels and Screens Chapter 2 ...
Page 80: ...4 8 Changing the Measurement Method Auto Manual 74 ...
Page 121: ...115 8 9 7 Chapter 7 Instrument System Settings Instrument System Settings Chapter 7 ...
Page 144: ...7 14 Setting the Backlight 138 ...
Page 284: ...10 14 Measurement Networks 278 ...
Page 290: ...11 4 Instrument Disposal 284 ...
Page 320: ...Appendix4 External Dimensions A30 ...
Page 323: ......
Page 324: ......
Page 325: ......
Page 326: ......