
Index
ii
N
Negative phase
............................................ 68, 80
Network
...................................... 48, 155, 259, 269
nointerrupted performance check
Normal condition
.......................................... 61, A3
P
Panel Load
............................................... 116, 120
Patient auxiliary current measurement
patient leakage current I
..................................... 90
Patient leakage current measurement
(external voltage on a SIP/SOP)
Patient leakage current measurement
(external voltage on a specific F-type applied part)
............................................................................ 17
Patient leakage current measurement
(external voltage on metal accessible part not
protectively earthed)
........................................... 18
Patient leakage current measurement
(Patient connection - Earth)
............................... 15
Patient leakage current measurement*
(external voltage on a SIP/SOP)
Patient leakage current measurement*
(external voltage on a specific F-type applied part)
............................................................................ 95
Patient leakage current measurement*
(external voltage on metal accessible part not
protectively earthed)
........................................... 97
Patient leakage current measurement*
(Patient connection - Earth)
............................... 90
Peak Over
.......................................................... 58
Polarity Change
................................................ 116
Polarity Switching
....................................... 22, 261
Positive phase
.............................................. 68, 80
Power consumption
............................................ 44
Power inlet
......................................................... 25
Power On Polarity Switching
............................ 126
pre-check
..................................................... 88, 89
R
................................ 41, 116, 128, 239
Repair
............................................................... 280
RS-232C
.......................................................... 144
S
S10, S12 and S13
................................ 35, 80, 200
save
.................................................................... 29
Saved data
....................................................... 158
Self-test
............................................ 116, 124, 164
Single-fault condition
.......................................... 61
Size
.................................................................. 266
Specifications
................................................... 255
Storage
............................................................. 266
System
..................................................... 159, 263
T
Target current
....................................... 29, 64, 190
terminal
............................................................... 36
Terminal block
.............................................. 24, 33
Time
................................................................... 70
Timing Chart
..................................................... 251
Total patient leakage current measurement
Total patient leakage(current measurement)
Types of Leakage Current
.................................. 12
Types of Leakage Current Measurement
U
Unit of current measurement
.............................. 57
.................................................. 133, 140, 144
V
Voltmeter mode
................................................ 158
W
Wiring adapter
Summary of Contents for ST5540
Page 2: ......
Page 6: ...Contents iv Index i ...
Page 29: ...23 2 Chapter 2 Instrument Labels and Screens Instrument Labels and Screens Chapter 2 ...
Page 80: ...4 8 Changing the Measurement Method Auto Manual 74 ...
Page 121: ...115 8 9 7 Chapter 7 Instrument System Settings Instrument System Settings Chapter 7 ...
Page 144: ...7 14 Setting the Backlight 138 ...
Page 284: ...10 14 Measurement Networks 278 ...
Page 290: ...11 4 Instrument Disposal 284 ...
Page 320: ...Appendix4 External Dimensions A30 ...
Page 323: ......
Page 324: ......
Page 325: ......
Page 326: ......