6.3 Measurement examples
94
1.
Connect the instrument and the equipment under test.
See
"3.3 Connecting equipment under test to the instrument" (p. 36)
2.
Connect test leads to terminals T2 and T3.
3.
Position the tip of the test lead connected to terminal T2 on the applied part of the equipment
under test.
4.
Position the tip of the test lead connected to terminal T3 on an ungrounded signal input section
or signal output section of the equipment under test.
5.
During manual measurement,
is available upon return to the measurement screen. Press
to start patient leakage current (external voltage on a SIP/SOP)/patient leakage current II
measurement.
Pressing
applies a high voltage to the test lead connected to the T3 terminal.
Press
to terminate output of high voltage.
During automatic measurements,
becomes available upon return to the measurement
screen. Press
to start patient leakage current (external voltage on a SIP/SOP)/patient
leakage current II measurement.
Only
is available during automatic measurements.
1
2
3
4
5
Terminal T3 and I/O terminal
Terminal T2 and applied part
red
black
Summary of Contents for ST5540
Page 2: ......
Page 6: ...Contents iv Index i ...
Page 29: ...23 2 Chapter 2 Instrument Labels and Screens Instrument Labels and Screens Chapter 2 ...
Page 80: ...4 8 Changing the Measurement Method Auto Manual 74 ...
Page 121: ...115 8 9 7 Chapter 7 Instrument System Settings Instrument System Settings Chapter 7 ...
Page 144: ...7 14 Setting the Backlight 138 ...
Page 284: ...10 14 Measurement Networks 278 ...
Page 290: ...11 4 Instrument Disposal 284 ...
Page 320: ...Appendix4 External Dimensions A30 ...
Page 323: ......
Page 324: ......
Page 325: ......
Page 326: ......