7.7 Power On Polarity Switching (to keep equipment under test on during polarity
127
8
9
7
Cha
pter 7
Instru
ment
Syste
m
Settings
1.
Check that the isolation transformer is correctly connected.
2.
On the initial screen, press
to display the system screen.
Press
and set power on polarity switching to On.
3.
To go directly to a leakage current test without performing relay check 2, press
to continue
to tests.
To perform relay check 2, press
.
"Relay check 2" (p. 128) checks relay operation by turning the LINE IN power supply line on and
off.
Setting Power On Polarity Switching
Power on polarity switching setting screen
System screen
2
When using power on polarity switching, a nointerrupted performance check
(power on polarity switching wiring check) is performed automatically at the fol-
lowing times:
• When a leakage current mode is selected (during manual measurement)
• When manual operation is selected on a leakage current mode screen
• When the polarity is changed on a leakage current mode screen
• When "START" is selected on a leakage current mode screen
• During panel load operation
If NG occurs, an error screen appears, check the isolation transformer and
instrument connections.
If OK, the leakage current measurement screen appears.
Start measurements.
See
"6.3 Measurement examples" (p. 83)
If NG, press
to return to the leakage current mode selection screen to
check connections again.
Error screen
Summary of Contents for ST5540
Page 2: ......
Page 6: ...Contents iv Index i ...
Page 29: ...23 2 Chapter 2 Instrument Labels and Screens Instrument Labels and Screens Chapter 2 ...
Page 80: ...4 8 Changing the Measurement Method Auto Manual 74 ...
Page 121: ...115 8 9 7 Chapter 7 Instrument System Settings Instrument System Settings Chapter 7 ...
Page 144: ...7 14 Setting the Backlight 138 ...
Page 284: ...10 14 Measurement Networks 278 ...
Page 290: ...11 4 Instrument Disposal 284 ...
Page 320: ...Appendix4 External Dimensions A30 ...
Page 323: ......
Page 324: ......
Page 325: ......
Page 326: ......