
6.3 Measurement examples
96
1.
Connect the instrument and the equipment under test.
See
"3.3 Connecting equipment under test to the instrument" (p. 36)
2.
Connect a test lead to terminal T2.
3.
Position the tip of the test lead on the applied part of the equipment under test.
4.
During manual measurement,
is available upon return to the measurement screen. Press
to start patient leakage current (external voltage on a specific F-type applied part)/patient
leakage current III measurement.
Pressing
applies a high voltage to the test lead connected to the T2 terminal.
Press
to terminate output of high voltage.
During automatic measurements,
becomes available upon return to the measurement
screen. Press
to start patient leakage current (external voltage on a specific F-type
applied part)/patient leakage current III measurement.
Only
is available during automatic measurements.
1
2
3
4
Terminal T2 and applied part
red
Summary of Contents for ST5540
Page 2: ......
Page 6: ...Contents iv Index i ...
Page 29: ...23 2 Chapter 2 Instrument Labels and Screens Instrument Labels and Screens Chapter 2 ...
Page 80: ...4 8 Changing the Measurement Method Auto Manual 74 ...
Page 121: ...115 8 9 7 Chapter 7 Instrument System Settings Instrument System Settings Chapter 7 ...
Page 144: ...7 14 Setting the Backlight 138 ...
Page 284: ...10 14 Measurement Networks 278 ...
Page 290: ...11 4 Instrument Disposal 284 ...
Page 320: ...Appendix4 External Dimensions A30 ...
Page 323: ......
Page 324: ......
Page 325: ......
Page 326: ......