Chapter 4 Operation and Run Instructions GK600 User Manual
- 70 -
4.2 First-time Power up
Perform wiring in strict accordance with technical requirements as set forth in Chapter 3 -
Installation and Wiring. The flow chart of first-time power up is as shown as below:
Fig. 4-17 Flow chart of first-time power up for asynchronous motor