
8-VALVE 1.4
ENGINE
FIAT PUNTO TRAINING OUTLINE
Fiat Auto S.p.A.
After Sales Training
Fit the power unit support (valve gear side), then secure it by means of the fasteners to the
specified torque (5.4 ÷ 6.6 daNm) and the front support elastic dowels (4.5 ÷ 5.5 daNm).
Remove the engine oil sump arm lifting device.
Connect the intermediate junction of the degassing pipe.
Connect the revs sensor electric connection.
Connect the minimum oil pressure switch electric connection.
Fit the timing belt protection lower cover, then secure it by means of its respective screws.
Fit the drive shaft pulley, then tighten the screws to the specified torque (2.2 ÷ 2.7 daNm).
Act on the belt stretcher to fit the auxiliary member belt.
Fit the timing belt upper cover.
Fit the ignition coil module, then tighten the respective screws to the specified torque (0.8 ÷
1.0 daNM).
Connect the ignition coil module electric connection.
Connect the phase sensor electric connection.
Connect the front engine junction.
Connect the electric connection of the oxygen sensor upstream the catalyst.
Connect the injection control unit ground cable.
Connect the injection control unit electric connections.
gb Fiat Grande Punto OK
323 / 532
© 2004 Fiat Auto S.p.A. – All rights reserved