DMS-R-IM
Operation
April 7, 2021
Digital Modular System - Rinse
4-17
Step.
Description
Images illustration
13
Close or adjust ball valve to the status
(Normally Closed, Normally Open or
Adjust) stated on the ball valve tag or
table in the plumbing schematic.
Normally, when tanks is full,
Close
Initial Fill
valves.
Adjust
Fill
valves to desired flow
rate to maintain water level in
station during process.
N/A
14
Close the underneath lift up door.
N/A