DMS-R-IM
Interpreting HMI
April 7, 2021
Digital Modular System - Rinse
5-25
Auto-Fill Option:
Button
Description
[High Conductivity
Fill]
Press to enable DI water
Auto
fill function whenever
conductivity reading in station is higher than high
conductivity set point respectively. DI water will
continuously fill until conductivity reading is lower
than set point.
Note:
1.
User can only choose to enable “Basket in Tank Fill” option or “Basket
Timed Fill”
option. Both options cannot be turned ON simultaneously.
2.
“High Conductivity Fill” is a standalone feature. User can trigger “High
Conductivity Fill” feature to turn ON together with either “Basket In Tank
Fill” or “Basket Timed Fill” feature.