3
In
st
al
la
tio
n
I n s t a l l a t i o n - C o n t r o l & C o m m u n i c a t i o n W i r i n g l
3-73
Connecting the Dr ying Monitor
Probe to the Dr yer
From the Top of the CH Hopper
1
Connect the cable supplied with the DM probe to the receptacle in the top
of the probe.
2
Route the DM cable from the DM probe to the side of the EnergySmart
Dryer’s electrical enclosure.
3
Connect the DM cable to the DM cable receptacle on the side of the
EnergySmart Dryer’s electrical enclosure.
IMPORTANT:
Always refer
to the wiring diagrams
that came with your
Drying Monitor before
making electrical connec-
tions.
DM Cable
Connection at
the Probe
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...