3-20
l I n s t a l l a t i o n - G e n e r a l
Installing the Cyclone
(optional) (continued)
11
Be sure to make any adjustments necessary to the cyclone or tubing
assembly.
12
Tighten all bolts within the cyclone and tubing assemblies with an
appropriately-sized wrench.
13
Locate the 45 degree piece of tubing.
14
Bolt the 45 degree piece of tubing to the outlet of the cyclone using the
supplied hardware.
Be sure to place the supplied gasket between the tubing
and the cyclone outlet before tightening bolts. Mounting orientation is depend-
ent upon your system’s configuration.
15
Bolt the straight piece of tubing to the assembly in Step 14 using the sup-
plied hardware.
Be sure to place the supplied gasket between the two (2)
pieces of tubing before tighten the tube bolts.
45 Degree
Tubing
(continued)
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...