Installing the Dr ying Monitor Probe
(continued)
Through the Door of the CH Hopper
The Drying Monitor (DM) probe can also be installed from the inside of the CH
Hopper and secured to the hopper lid section.
1
Remove the two (2) adapter plates from the probe mounting assembly.
Set
the adapter plates aside for use in Step 5.
2
Insert the probe and mounting assembly through the door of the CH
Hopper.
3
Pull the probe and mounting assembly through the hole in the top of the
hopper. Fold the gasket around the probe so that it will fit through the
hole.
4
Place the gasket over the probe hole.
5
Place the adapter plates over the gas-
ket and secure them to the hopper
with three (3) 10-32 UNF screws.
Make sure the adapter plate with the
threaded hole is on the bottom, and that
the slots in the adapter plates are ori-
ented in the opposite direction as
shown (See the drawing on the next
page).
6
Secure the coupling to the adapter plates
with the four (4) 10-32 UNF
screws.
7
Screw the fitting into the coupling.
Tighten with an appropriately-sized
wrench.
8
Make sure the probe is the correct size.
The probe should extend from just
above the top of the hopper into the hopper, with the tip approximately in-
line with the bottom edge of the diffuser cone.
DM Probe
Location
I n s t a l l a t i o n - G e n e r a l l
3-23
3
In
st
al
la
tio
n
(continued)
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...