Starting the Energ ySmart Dr yer
System
(continued)
Without OptiMizer
TM
Mode
11
Monitor the temperature readout profile on to the Material Temperature
Trending Screen (Screen 9)
until the material temperature within the hopper
reaches and maintains a steady state (approximately 4 to 6 hours).
12
Start the injection processing/extrusion machine,
after the normal pre-dry
time is complete (approximately 4 to 6 hours). The injection machine will
begin taking material out of the hopper. As the system is running it will take
several hours for all components to reach a steady-state running condition.
Conair recommends waiting until the system is in a constant steady state
before making changes to temperature and air flow setpoints.
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...