l I n s t a l l a t i o n - G e n e r a l
Positioning the CH Hopper Floor
Stand
WARNING:
You are responsible for the structural integrity of this installation.
CAUTION:
Care should be taken while moving the main CH Hopper floor stand and
sections to ensure that no damage occurs during assembly.
I
MPORTANT:
You will need to consider the installation of your entire dryer system
before permanently placing any system component,
see Installation - Piping and
Hoses for reference.
Due to the varying size of Conair CH Hoppers, Conair recommends:
•
Following all applicable local building and safety codes
1
Make sure the installation location for the CH Hopper meets all provisions for
clearances, will support the weight of the fully loaded hopper and provides
space for the installation of the other system components, such as optional
receivers.
See the specifications and drawings supplied with your system for
details.
2
Using a forklift, hoist or crane, move the floor stand to its installation location.
NOTE:
For EnergySmart Dryer
Systems supplied with "small"
hoppers, the floor stand and cone
section may be pre-assembled
from Conair.
✐
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...