3
In
st
al
la
tio
n
I n s t a l l a t i o n - Te s t i n g l
3-105
Testing the Primar y Receiver
(optional)
1
Make sure there is no material in the Primary hopper.
2
Disconnect the material supply hose of the optional receiver at the source.
3
Login to the EnergySmart Dryer control under the appropriate user name
and password.
See Operation section entitled, Control Function Descriptions,
Screen 1A-Login Screen.
4
Navigate to the System Overview Screen (Screen 6).
5
Press the receiver’s magnifying glass icon to access the Primary Loader
Screen (Screen 5).
(continued)
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...