Connecting the Energ ySmart
Control to System Components
(continued)
Connecting the Air Process Air Flow Transmitter
The EnergySmart Drying System uses data from the Dwyer 641 Air Velocity
Transmitter (AVT) for drying process air flow information.
IMPORTANT:
Always refer to the wiring diagrams that came with your
EnergySmart Dryer System before making electrical connections.
NOTE:
Conair recommends the connections between the EnergySmart Dryer and system
components should be made with properly sized conductors and properly protected with
appropriate conduit (customer supplied). The routing should be neat and away from
potential mechanical damage.
CAUTION:
Always disconnect and lock out the main power sources before
making electrical connections. Electrical connections should be made only by
qualified personnel.
To connect the AVT to the EnergySmart Dryer electrical panel:
1
Disconnect and/or lock out main power to the EnergySmart Dryer.
2
Route the wires from the AVT to the EnergySmart Dryer electrical panel.
3
Determine the location of the entry port on EnergySmart Dryer’s electri-
cal panel for the AVT wires.
Open the door of the EnergySmart control
panel.
4
Drill or cut the entry port.
4b
If using electrical conduit, cut entry port and then run customer supplied
conduit from the EnergySmart Dryer’s electrical enclosure to the AVT.
5
Insert the AVT wires through the entry port on the dryer’s control panel.
Secure the wires with an appropriately-sized strain relief.
✐
(continued)
ON
O
O
FF
IMPORTANT:
Always refer
to the wiring diagrams that
came with your AVT and
EnergySmart Dryer before
making electrical connec-
tions.
3-80
l I n s t a l l a t i o n - C o n t r o l & C o m m u n i c a t i o n W i r i n g
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...