3
In
st
al
la
tio
n
I n s t a l l a t i o n - Te s t i n g l
3-97
Checking for Proper Air Flow
(continued)
2
From the Login Screen (Screen 1), press the “Dehumid Drying” button.
3
Open the dryer’s side panel doors.
If your dryer has locking door bolts,
see
Installation section entitled, Checking the Dryer for Proper Air Flow, Opening
the Dryer Doors.
4
Press the “Start” button and then the “Stop” button
located within the
Dryer: Dry Air Circuit window of the Dehumidifying Drying Screen (Screen 6).
5
Visually verify the blower motor is moving in the correct direction indicat-
ed by the arrow on the blower housing.
The EnergySmart W series 600-5000
dryers are equipped with centrifugal process blow-
ers. Remember to also check the regen blower on
ES1.
WARNING:
All wiring,
disconnects, and fuses
should be installed by
qualified electrical tech-
nicians in accordance
with electrical codes in
your region. Always
maintain a safe ground.
Do not operate the
equipment at power lev-
els other than what is
specified on the machine
serial tag and data plate.
(continued)
Direction
Indication
Arrow
Direction
Indication
Arrow
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...