4-68
l O p e r a t i o n
Starting the Energ ySmart Dr yer
System
With OptiMizer
TM
Mode
6
Navigate to the System Control Screen (Screen 8).
7
Enable the OptiMizer™ Mode from the System Control Screen (Screen 8).
See Operation section entitled, Using the OptiMizer™.
8
Press the “Start System” button
to begin pre-drying your material. The pre-dry-
ing stage will use the pre-dry temperature and air flow settings that the user
entered within the selected dryer recipe.
9
Start your processing machine when the control displays the message “OK to
Start”.
This message indicates that the material within the hopper has reached the
correct processing temperature and is ready to be used. Additional messages may
appear if you haven’t started your injection machine after the initial message:
• OK to Start - Reminder (4 hours)
• Start Machine or Cool Down Material (8 hours)
• Material Should Be Cooled (10 hours)
(continued)
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...