4
O
p
er
at
io
n
(continued)
O p e r a t i o n l
4-41
Control Function Descriptions
(continued)
Screen 26 -Regeneration Heat PID Setup Screen
To access the Regeneration Heat PID Setup Screen (Screen 26):
1
Press the "Regen PID Setup” button
located on the Equipment Setup Screen
(Screen 20).
The Regeneration Heat PID Setup screen allows the user to Start or Stop the dryer,
indicates the dryer’s status (running or idle) of the process and information concerning
the air flow leaving the blower and its dew point. It also shows the user PID gain, inte-
gral, derivative, and the deadband setpoints of the regeneration circuit.
If the user is logged-in at the proper security level, all setpoints contained on this screen
can be changed using the pop-up keypad window.
The user can also view the other system parameters, start the system, stop the system,
initiate a system Cool Down or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
NOTE:
Set points boxes are white
with heavy black borders. Set
points can be changed, if the user
has logged in at the proper security
level, by pressing the setpoint
boxes. This will launch a pop-up
keypad window that can be used to
change the setpoint.
See Operation
section entitled, Example Set Point
Change.
After the new setpoint
value has been entered, press the
"Enter"
key to lock in the new set-
point.
✐
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...