O p e r a t i o n l
4-71
4
O
p
er
at
io
n
CAUTION:
Improper
shutdown can cause
damage to the
EnergySmart Dryer
System and its com-
ponents.
NOTE:
Set points boxes are white
with heavy black borders. Set
points can be changed, if the user
has logged in at the proper security
level, by pressing the setpoint
boxes. This will launch a pop-up
keypad window that can be used to
change the setpoint.
See Operation
section entitled, Example Set Point
Change.
After the new setpoint
value has been entered, press the
"Enter"
key to lock in the new set-
point.
✐
NOTE:
The material inside the dry-
ing hopper will remain hot. If this
system will be off for a long period
of time, you may want to initiate a
“System Cool Down.”
✐
(continued)
Stopping the Energ ySmart Dr yer
System
There are three (3) ways to stop the EnergySmart Dryer System from the
EnergySmart Dryer:
•
Pressing the “Stop System” button
•
Pressing the “System Cool down” button
•
Pressing the Emergency Stop switch
To stop the EnergySmart Dryer System using “System Stop”:
1
Stop the processing machine and stop taking material out of the hopper.
2
Navigate to the System Control Screen (Screen 8).
3
Press the "System Stop" button on the System Control Screen
(Screen 8).
When the Stop System function is used, the heater (HTC or GasTrac) will immedi-
ately be turned off. The blower in the EnergySmart Dryer will continue to run
until the air entering the CH hopper cools to 150°F {65.6°C} or until the ten (10)
minute timer has expired.
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...