4-98
l O p e r a t i o n
Using the OptiMizer™
(continued)
OptiMizer™ Quick Up Setup Screen
The OptiMizer™ Quick Up Setup screen is used to enter the setpoints for the
Quick Up sequence. This sequence is enabled after material flow has been detect-
ed. The Quick Up is used when the material temperature and the temperature pro-
file in the hopper falls below the setpoints. A Quick up is designed to provide
immediate heat to the system. This is used when the control predicts that a disrup-
tion from norm has occurred and it may cause the material conditions to be dis-
rupted at the throat. This is a safety to prevent material from being delivered to the
machine throat at lower than desired conditions.
(continued)
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...