4-44
l O p e r a t i o n
Control Function Descriptions
(continued)
Screen 29 - Primary Hopper Loader Setup Screen (optional)
To access the Primary Hopper Loader Setup Screen (Screen 29):
1
Press the "Loader” button
located on the Equipment Setup Screen (Screen 20).
The Primary Hopper Loader Setup screen allows the user to enable or disable the
optional receiver and to choose the type of purge valve working with the receiver.
To select the type of valve:
1
Use the up and down arrow buttons to make the selection.
The current selection
will be indicated by a yellow triangle.
2
Press the “Enter” button to lock in the current selection.
The user can also view the other system parameters, start the system, stop the system,
initiate a system Cool Down or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
(continued)
None
Summary of Contents for HTC 120
Page 10: ...viii l Table of Contents ...
Page 30: ...2 14 l Description ...
Page 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Page 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Page 80: ...3 50 l Installation Piping Hoses ...
Page 88: ...3 58 l Installation Piping Hoses ...
Page 92: ...3 62 l Installation Conveying Lines ...
Page 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Page 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Page 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Page 250: ...4 108 l Operation ...
Page 286: ...5 36 l Maintenance ...