600 FH OR 12 MONTHS INSPECTION
FUNCTION, DATA FOR PLANS AND DESCRIPTION
Table of Contents
Page
1
2
Index of Tables
Page
1
2
References
Table 1 References
Data module/Technical publication
Title
12-B-05-20-00-00A-018A-A
SCHEDULED MAINTENANCE CHECK LISTS - INTRODUC-
TION
12-B-12-20-04-00A-902A-A
LANDING GEAR - SERVICING
12-B-29-10-04-00A-313A-A
RETURN LINE FILTER DIFFERENTIAL PRESSURE INDICA-
TOR - INSPECTION/CHECK
AIR INTAKE DE–ICE SYSTEM - ADJUSTMENT/TEST
12-B-30-30-20-00A-903A-A
PROBES DE-ICE SYSTEM - ADJUSTMENT/TEST
12-B-30-60-00-00A-313A-A
FOUR-BLADED PROPELLER DE–ICE SYSTEM - INSPEC-
TION/CHECK
12-B-30-60-00-00A-313B-A
FIVE-BLADED PROPELLER DE-ICE SYSTEM - INSPEC-
TION/CHECK
12-B-30-60-00-00A-903A-A
FOUR-BLADED PROPELLER DE–ICE SYSTEM (WITHOUT
PROPELLER DE-ICE TEST SET) - ADJUSTMENT/TEST
12-B-30-60-00-00A-903B-A
FIVE-BLADED PROPELLER DE-ICE SYSTEM (WITHOUT
PROPELLER DE-ICE TEST SET) - ADJUSTMENT/TEST
FOUR-BLADED PROPELLER DE–ICE SYSTEM (WITH PRO-
PELLER DE-ICE TEST SET) - ADJUSTMENT/TEST
FIVE-BLADED PROPELLER DE–ICE SYSTEM (WITH PRO-
PELLER DE-ICE TEST SET) - ADJUSTMENT/TEST
12-B-32-10-00-00A-902A-A
MAIN LANDING GEAR SHOCK ABSORBER - SERVICING
12-B-32-20-00-00A-902A-A
NOSE LANDING GEAR SHOCK ABSORBER - SERVICING
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 26 MSN 545, 1001-1719,
1721-1999
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-05-40-01-04A-000B-A
UNCLASSIFIED
2021-12-04 Page 1