Name
Identifications/References
Qty
Reference
Remark
Bolt AN3-3A (Propeller balance
weights)
CSN 61-10-00-01-060
AR
Washer NAS1149F0363P (Pro-
peller balance weights)
CSN 61-10-00-01-065
AR
Washer NAS1149F0332P (Pro-
peller balance weights)
CSN 61-10-00-01-070
AR
Washer AN970-3 (Propeller bal-
ance weights)
CSN 61-10-00-01-075
AR
Safety Conditions
CAUTION
WHEN AN OVERHAUL OF A PROPELLER IS DONE YOU MUST DO A STATIC BALANCE BEFORE A
DYNAMIC BALANCE IS DONE.
Note
To identify the consumable items used in this procedure refer to the Consumable Materials List, AMM
12-B-20-31-
00-00A-070A-A
.
Note
To identify the AGE and tools used in this procedure refer to the list of AGE and Tools TEM
12-B-00-00-00-00A-
060A-A
.
Note
To identify the access panels refer to access provision, AMM
12-B-06-20-00-00A-040A-A
.
Note
For removal and installation of engine cowlings refer to, AMM
12-B-71-10-00-00A-920A-A
.
Procedure
1
General
This document gives the procedures to do a dynamic balance of the propeller with the Vibrex 8350 or
the Vibrex 2000 propeller balancing equipment. The job set up information, preparation and close up
procedures are the same for the two types of equipment.
A dynamic balance is recommended when:
−
The propeller is removed and installed or replaced
−
The engine or power section is removed and installed or replaced
−
Repairs or replacements are done to the propeller hub or the propeller blades.
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 26 MSN 545, 1001-1719,
1721-1999
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-61-00-00-00A-903B-A
UNCLASSIFIED
2021-12-04 Page 3