Table 2 Master Maintenance Plan Task List (Continued from previous page)
Task number
Item Name
Task Description
Interval
Data Module Refer-
ence
71-00/301
Engine tubular
mounting frame fire-
wall attachment fit-
tings
Examine with firewall
insulation blanket re-
moved as necessary.
If cracked, blistered
or flaking paint is
found on the mount-
ing frame refer to
SRM.
1,200 FH / 12 Months SRM
12-B-54-20-02-00A-
664A-A
*71-00/327
Engine mounting
frame (Post SB
04-009)
Life limit
25,000 FH /
30,000 LDG
See Note 1
-
*71-00/401
Engine mount
Magnetic particle in-
spection
Inspection kit en-
gine mount P/N
500.60.12.006
Threshold
26,600 FH /
35,000 LDG
Repeat
6,600 FH /
8,000 LDG
12-B-71-00-05-00A-
352A-A
71-00/432
Power plant and ac-
cessories
Refer to P&WC EMM
Chapter 72-00-00 Pe-
riodic Inspection and
do the minor and
time limited inspec-
tion items
Refer to P&WC EMM
Chapter 72-00-00 Pe-
riodic Inspection
-
71-00/476
P&WC airworthiness
directives and service
bulletins
Reviewed and com-
plied with as neces-
sary
Job Close Up
-
71-10/207
Engine cowlings ENG
43AL and ENG 43AR
Open and examine,
particularly for condi-
tion of rubbing strips
and fasteners. Lubri-
cate the hinges with a
minimum of material
P10-001.
Job Set Up
-
71-10/208
Engine cowlings ENG
43AL and ENG 43AR
Close
Job Close Up
-
*72-00/18
Engine rotor compo-
nents
Life limit
P&WC SB 14002 lat-
est revision
-
72-00/39
Engine
Overhaul
3,500 FH
P&WC SB 14603 lat-
est revision
-
72-00/308
Engine accessories
Overhaul
P&WC SB 14603 lat-
est revision
-
74-00/288
Ignition system
Operational test
300 FH / 12 Months
12-B-74-00-00-00A-
903A-A
76-00/210
Engine controls in en-
gine compartment
Examine
600 FH / 12 Months
-
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 26 MSN 545, 1001-1719,
1721-1999
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-05-40-00-00A-000B-A
UNCLASSIFIED
2021-12-04 Page 51