3.22
Connect the electrical connector P148.
3.23
Install the panel 12AB with the screws.
3.24
Do the exterior lights operational test for the landing, navigation, strobe, recognition and red beacon (if
installed), refer to AMM 12-B-33-40-00-00A-903A-A.
3.25
Do the operational test of the probes de-ice system, refer to AMM 12-B-30-30-20-00A-903A-A.
3.26
Remove all the equipment, tools and materials from the work area. Make sure that the work area is
clean.
3.27
Install the access panels 12AL, 12BL, 12DL, 12EL and 12FL.
3.28
Close the access panel 11AL.
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 26 MSN 545, 1001-1719,
1721-1999
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-57-00-00-00A-720B-A
UNCLASSIFIED
2021-12-04 Page 17